Verification and Validation

Two questions, easy to confuse, and a system can pass one while failing the other.

  • Verification: are we building the product right? Does the artefact match its specification?
  • Validation: are we building the right product? Does it solve the user's actual problem?

The V-model view

Verification checks each step against the step above it. Validation checks the finished system against the need that started it.

graph LR
    N[User need] --> R[Requirements]
    R --> D[Design]
    D --> C[Code]
    C --> UT[Unit tests]
    UT --> IT[Integration tests]
    IT --> ST[System tests]
    ST --> AT[Acceptance tests]
    AT -.->|validation| N
    UT -.->|verification| D
    IT -.->|verification| D
    ST -.->|verification| R

The left side builds specifications, the right side checks them. This is the same shape as the V-Model, where each test level was designed to verify one specific development artefact.

The four outcomes

Validated Not validated
Verified Correct software solving the right problem A flawless implementation of the wrong thing
Not verified Right idea, buggy build Failing on both counts

The top-right cell is the expensive one, and it is invisible to any amount of testing against the specification. Every test passes. The spec was wrong.

How each one is done

Verification Validation
Against Specifications, designs, standards User needs, business goals
Techniques Reviews, static analysis, unit and integration tests, contract testing User acceptance testing, demos, usability testing, beta releases, production metrics
Answers Does it match what we wrote down? Does it help the person it was for?
Can be fully automated Largely yes Rarely, it needs human judgement
Cheapest form Review the artefact before building on it Show a working slice to a real user early

Note that most of the verification column is machine-checkable and most of the validation column is not. That asymmetry explains why teams over-invest in verification: it is the half that a pipeline can do for you.

A worked confusion

A requirement says: "Export must return the last 30 days of transactions as CSV."

Verification succeeds: the export returns exactly 30 days, encoded as CSV, with tests covering the boundary at day 30 and an empty range.

Validation fails: accountants needed the previous calendar month for reconciliation, and a rolling 30 day window never matches a month boundary. The feature is correct and useless.

Only contact with a real user surfaces this, and the cheapest moment for that contact is before the code exists.

graph LR
    U[Real user need] --> S[Written requirement]
    S --> B[Build]
    B --> V1[Verification: build matches requirement]
    V1 --> OK[Green tests]
    U -. gap not covered by any test .-> S

The gap sits between need and written requirement, upstream of everything the test suite can see.

Practical guidance

  • Validate early and in small slices. A demo of one working flow at week two beats a perfect acceptance phase at month six.
  • Treat acceptance criteria as the handshake between the two: written by or with the person who has the need, and specific enough to verify.
  • Use production signals as continuing validation. Feature usage, funnel drop-off and support tickets tell you whether the built thing was the right thing.
  • Keep verification cheap and automated, so that human attention is free for validation, which cannot be automated.

Check Your Understanding

#

A payment feature passes every unit, integration and system test, then merchants say it does not fit how they settle funds. What happened?

#

Which activity is validation rather than verification?